01/
Project
Details
Client: Newton Heath Depot
Newton Heath was surveyed by PBH due to various concerns raised by the Depot Manager regarding the condition of the structure, therefore a survey was required to assess what repairs were needed to be undertaken. PBH installed and coordinated a new grid tied to Snake Grid TPEN11 utilising 6-hour GNSS observations as per the Northern Programmes standard.
A mix of traditional topographical survey, UAV survey and terrestrial laser scanning was undertaken in order to deliver this project in the most efficient manner. The final deliverables were delivered to LOD300 standard along with our usual 3d dgn, registered point cloud and full NR3100 standard survey report. A flythrough of the site was created in order to assist the client with their design from the comfort of their own desk, minimising the need for further site walkouts.