01/

Project

Details

Project Case Study: Preston to Blackpool Control Validation Drainage and DVS Surveys

Client/Organisation: VolkerRail

Project Duration: 2018 - 2019

PBH are currently re-coordinating and carrying out a control validation survey for 17 miles between Preston to Blackpool North Station. The control network is being upgraded from Network Rails 3100 & 3101 standards to Network Rails Northern Programs Survey Strategy. The increased accuracy has been achieved by utilising a combination of GNSS static receivers, Trimble 0.5” total stations and levelling equipment to validate existing GNSS points, traverse the route and check levelling of the route. The resultant work has allowed an upgrade in the existing grid from a traverse closure of 1:50,000 to the new required 1:100,000 traverse closure.

Survey Service Projects

We’ve had the privilege of engaging in numerous intricate projects within the railway sector. We take pride in our ability to provide innovative solutions to the challenges encountered by our clients, ensuring optimal outcomes for all requirements. Here, we present a selection of case studies and projects highlighting our expertise and dedication in survey work within the railway industry.

Newton Heath Depot
Central Rail Systems Alliance Plain Line Renewals – Eastern, Central & Western
Kilsby Tunnel
Central Rail Systems Alliance S&C
LNE/LNW Plain Line Renewal
Preston to Blackpool Control Validation Drainage and DVS Surveys
Emergency Works
Central Rail Systems Alliance CP7 Contract